Local News

More Power Bares Line Maintenance Work Results

In a social media post, More Electric and Power Corporation bared the results of their line maintenance works at the La Paz Feeder 03 distribution lines. It may be recalled that the distribution utility announced a scheduled power interruption last November 14 and 15 to conduct maintenance work as well as replace dilapidated poles in several areas in the metro.

“As part of our ongoing efforts to eradicate the deeply-rooted problems of dilapidated facilities in our electric distribution system, we are continuously conducting corrective and maintenance in our distribution lines. We were able to conduct line works to replace dilapidated and sub-standard primary poles with new concrete poles along Locsin St., Saint Joseph Subdivision, along Jereos St., and near the entrance of Ledesco Village. These are all part MORE Power’s three-year development plan to replace and modernize the facilities of our electric distribution system,” More Power Iloilo in a social media post.

MORE Power Iloilo is one with the leaders in the beautification of Iloilo City. It may be recalled that last October, More removed high tension wires and seven concrete poles at Esplanade in Muelle Loney to make it safer and even more stunning for everyone.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.